Thread: Ready
View Single Post
  #2  
Old 03-17-2016, 05:13 PM
Tawn Tawn is offline
Senior Member
 
Join Date: Jan 2013
Posts: 329
Default

Bottom paint done. Went from black to green.

All new zincs

Changed the boot stripe from red to green.

Jim Catterton took care of the compounding and waxing.

This Monday is the USCG dry dock inspection - plan to go in the water as soon as that is done and then Thursday, 31 March is the in-water USCG inspection.
Attached Images
File Type: jpg Zincs.jpg (82.1 KB, 19 views)
File Type: jpg Shined Up.jpg (87.0 KB, 29 views)
Reply With Quote